DDB
BOARD DECISIONS (9th September, 2009)
|
Decision
01
|
Action
by
|
Action
taken report
|
|
The Hon’ble Union Minister for New and Renewable
Energy desired that the comprehensive plan be formulated and
implemented for clearing and beautification for Brari Nambal and
Babi Dam, which are of vital importance for the proper
living in the city
|
Divisional Commissioner/ Vice Chairman, LAWDA
|
The Housing & Urban Dev. Deptt. vide letter
Bo:-HUD/Plan/500/2003 dated:-01/07/2010 has intimated that a
project report has been formulated for an amount of Rs. 26.60
Crores. The
following are main features of the project for Development of
Brari Numbal Lagoon :
a) Land Acquisition.
b) Conversion of Landmass into water body at the
expanse of water.
c) Shoreline Development.
d) Chain-link fencing.
e) Installation of fountains / aerators.
f) Beautification by way of electrification around
the lagoon.
g) Development of the heritage temple inside the
lagoon.
The work on the lagoon has been initiated in July,
2009 and in the 1st phase dredging and shoreline development has
been taken into hand. An
amount of Rs. 80.00 lacs has been released in favour of UEED for
diversion of 17 drains to the existing STP at Brari Numbal, some
of which have been diverted and rest are being diverted. During
the current financial year an amount of Rs. 6.20 crores is being
spent on various components of this project.
Acquisition of 176 kanal of proprietary land inside
the lagoon has been initiated and PDD has been requested to
realign 33 KVA Transmission line for resumption of shoreline
development.
|
|
Decision
02
|
Action
by
|
Action
taken report
|
|
The Hon’ble Union Minister for New
& Renewable Energy observed that huts are being
built in
Kralsangri area and desired
that Hon’ble Finance Minister and Hon’ble
Forest Minister
should visit Kralasangri area and probe as to how the
encroachments have came about and who had granted permissions to
build the huts/ road in the forest area.
While responding, the Hon’ble Chief Minister
informed that the Deputy Chief Minister had already taken
cognizance of the matter
and constituted a Committee headed by the
Commissioner/Secretary to Govt. (General Administration Deptt.)
to look into the matter for a preliminary report within 10 days.
|
Commissioner/ Secretary to Govt. GAD
Commr./ Secretary
H & UDD
|
The Secretary Lakes & Water Development
Authority Srinagar has intimated that permission to construct
Tourist village comprising of 22 units of different sizes &
spread over a total built up area of 78800 sq. feets has been
granted by this office vide order NO: 54-Bldg/LDA of 2008 Dated
: 12-06-2008 in favour of Mr. Shiekh Gh. Qadir S/O Gh.Ahmad
& others in
Gagerbugh Kralasangri Srinagar . Subsequently the Vice- Chairman
, LDA vide his letter NO: LWDA-PS/Vice Chairman /316
Dated : 18-10-2008 wrote to the Govt. to put the
implementation of the Project on hold . Commissioner / Secretary
to Govt. H&UDD has also been pleased to visit the site
personally on 2-09-2009 and has directed that no construction
activity should be permitted on site. General Adm. Department
vide Govt.Order NO: 1233- GAD of 2009 Dated : 04-09-2009 has
constituted a committee of six senior officers to examine the
case .
The Committee has examined the case in its entirety
and gave the following recommendations :
“ Keeping in view the aforementioned observations
, the committee recommends that the lakes & Waterways Dev.
Authority should make it incumbent upon the promoters to submit
a detailed Project Report ( DPR) of the proposed Tourist village
which needs to be evaluated by all the concerned agencies /
departments and any permission for development of the area as
Tourist Village should be subservient to the findings /
recommendations of these agencies/ departments
and to the fulfillment of such conditions as may be
prescribed .”
In pursuance of the said recommendations , this
office vide NO: LDA-BP/6400-6401 Dated : 30-10-2009 has asked
the promoters to give the following details:
•
Detailed project report of the
Tourist
Village
.
- Micro plans envisaging details about the location of each structure
with the associated ancillary infrastructural facilities
like electric and water supply, sewerage & drainage with
its disposal, lying of roads & pavement etc.
- Details about contour cutting, protection of slopes, cutting of
trees, herbs/shrubs and other flora & fauna.
- In addition, the Khasra nos involved are to be located on site as
well as a measure of ground truthing through Revenue
department in accordance with the original Aksi Latha
available with the Director, Land Records.
Subsequently through another communication under
LDA-BP-658/68830-33 Dated: 17-11-2009 the promoters have been
reminded to furnish the DPR’s to get it evaluated bu all the
concerned departments
/ agencies which will include Forest/ Ecology &
Environment , SPCB, Town Planning . The promoters have not
submitted any proposal so far. The Enforcement officer LDA has
been directed that no construction activity, whatsoever,
including the laying of roads / earth cutting/ trees, should be
permitted. The site is regularly being monitored by the
enforcement wing and is under constant surveillance to ensure
that no construction activity takes place there.
The Hon’ble High Court in the case PIL titled
Syed Tahir Iqbal Geelani V/S State in its hearing on 15-12-2009
has also directed that no construction activity should take
place on site. The decision of the DDB meeting & the
instructions of the Hon’ble High Court / Commissioner
Secretary to Govt. are being compiled with Toto.
|
|
Decision
03
|
Action
by
|
Action
taken report
|
|
The Hon’ble Minister
suggested that security forces
may be re-located from Sheri-i-Kashmir Cricket Stadium
for providing free
and open atmosphere
to the players and
requested for allotment of land
for construction of large
stadium near joinery Mill, Pampore. Besides, the Home Department
should examine the feasibility of paying an amount of Rs.75.00
lacs on account of rent which the security forces owe to JKCA
(Jammu& Kashmir Cricket Association).
The Hon’ble Chief Minister, while responding to
points raised by the Hon’ble Union
Minister informed that the
land near Joinery Mill Pampore
has been proposed
for development of
a satellite town together with other
important projects.
However, possibility of earmarking some land for JKCA for
construction of a new Cricket
Stadium around
will be
explored.
|
F C Home/Div. Commr. Kmr. / IGP, Kmr / Secretary,
Sports Council.
|
The Inspector
General of Police Kashmir Zone vide his letter No: GB/ZPHQ/M.
Meeting/09/24763-64 dated:17-11-2009
has intimated that
the stadium
has been got
vacated and
handed over to JKCA
. However, the rent case of
the said land
is under
process.
|
|
Decision
04
|
Action
by
|
Action
taken report
|
|
A committee shall be constituted under
the chairmanship of Divisional
Commissioner,
Kashmir
for identification of land in
for its transfer to Srinagar Municipal
Corporation for re-habilitation colonies and sites for
dumping of solid waste.
|
Div. Com. Kmr.
|
The Committee
has already been constituted by the Divisional Kashmir
Commissioner, vide order No DivCom/Dev-70 A/376-79 dated
24-4-2007, consisting of Addl. Dy. Commr. , Chief Town Planner,
SDA Joint Commr. SMC Asstt. Commr.(R) . The committee furnished
its report indicating sites viz Sumerbugh, Hakermullah and
Batapora and it was accordingly decided that the committee
constituted for purpose of identification of additional sites
for dumping of garbage of shall conduct spot inspection and
identify suitable sites. The Committee has inspected the sites
and again proposed the aforesaid sites and reported that
Sumerbugh in District Pulwama was considered to be potential
site for land fill. However, Batapora and few sites in the
vicinity of Nasrullahpora were also considered for which CTP-K
has given detailed technical report. However, a meeting to
finalize the sites shall be convened
very soon. Further in compliance to the court orders and
also as per the decisions taken in the High Level meeting held
under the Chairmanship of HE the Governor, J&K State on
10/2008 an indent has been placed with Collector Land
Acquisition, Srinagar by SMC for acquiring of additional land
measuring 400 Kanals falling in estate Dedmaribagh belonging to
M./S Gousia Group of Industries for expansion/upgradation/modernization
of existing dumping site. The Collector, Land
Acquisition, PWD Srinagar has issued notification under Section
4 on 10.10.2008, notifying 398 Kanals 01 Marlas land in estate
Dedmaribagh.
|
|
Decision
05
|
Action
by
|
Action
taken report
|
|
Rs.35.00 lacs stands released for development of
Boatman’s colony. The
demand for further allocation shall be projected subsequently.
|
VC, SDA, Sgr.
|
The VC, SDA, Srinagar vide his letter No: SDA/VC/6931
dated:20-01-2010 has intimated that the Govt. has accorded
authorization for an amount of Rs.50.00 lakhs for development of
Boatman colony and the works by way of surface drains in Mansoor/Boatman/EWS/LIG
colonies have been taken in hand which are in progress. Further
authorization of Rs.100.00 lakhs has been received against the
Action Plan submitted to the Government.
Decision Implemented
|
|
Decision
06
|
Action
by
|
Action
taken report
|
|
Srinagar Dev. Authority shall provide land for the
rehabilitation of people to be shifted from the bund of River
Jehlum i.e Chattabal Weir & Parimpora areas.
|
Vice Chairman, SDA, Sgr.
|
The VC, SDA, vide his letter No: SDA/VC/6931 dated:
20-01-2010 has intimated that the Government has transferred 65
kanals of land at Noorbagh for the rehabilitation of boatmen of
River Jhelum.
I & FC Department has identified 314
beneficiaries from Shivpora to Dubji Ghat and 96 Doongawallas
from Shivpora to Chattabal for rehabilitation out of them 176
boatmen were rehabilitated in Boatmen Colony Bemina and 218
in Noorbagh colony pursuant to the decisions
taken in the HLC from time to time.
Due to paucity of land the SDA is not in a position
to rehabilitate the Boatman of River Jhelum i.e. Chattabal weir
and Parimpora areas for which a fresh survey is being carried
out.
|
|
Decision
07
|
Action
by
|
Action
taken report
|
|
The issue of liabilities under district sector for
an amount of Rs.51.88 lacs shall be considered by the Planning
& Development department after submission of the factual
report by DDC, with
regard to creation of such liabilities.
|
Commr / Secy, P&DD / DDC, Sgr.
|
An amount of Rs.52.00 lacs has been released by the
Planning & Development department vide order NO: DP-15/DDB-Addl/
2009-10/Ps-901 Dated: 7-10-2009 for Clearance of liabilities
under district sector.
(Decision Implemented)
|
|
Decision
08
|
Action
by
|
Action
taken report
|
|
Scheme of
Financing shall be worked out
by the Planning & Finance
Departments for
contruction of Ropeway at
Ziyartat-i-Hazrat-I-
Sultan-Ul-Arifeen (R.A) so that
the funds
are made available
to implement the
project.
|
Secretary Tourism / Director Tourism (Kmr)
|
The Joint Director planning Tourism department has
intimated that the project will cost an amount of Rs.6.00 crores
of which Rs.1.50 crores as equity share has been approved by
Planning & Development department under State Plan while as
the balance cost of Rs.4.50 crores shall be raised as loan from
the Financial institutions. The Finance department has conveyed
its concurrence to provide counter guarantee for lifting the
loan.
Tenders have been finalized and the execution shall
start from July , 2010
|
|
Decision
09
|
Action
by
|
Action
taken report
|
|
For development of Infrastructure around Ziyarat
Peer Dastageer Sahib Shrine / Ziyarat Naqashband Sahib (R.A)
/Graveyard of 1931 Martyrs, a comprehensive Project shall be
prepared for seeking the required funding support.
|
Commr / Secy, P&DD/Finance Commr/ Secy,
R&B/Commr, MC, Sgr.
|
D.P.R’s for development of infrastructure around
the Shrine of Peer Dastageer Sahib, Khanyar and Ziyarat
Naqashband Sahib (R.A)/ Graveyard of 1931 Martyrs have been
framed at a cost of Rs.48.77 Crores and Rs.14.39 Crores
respectively. Detailed Project Reports shall be framed on
receipt of detailed Architectural drawings from Chief Architect,
Kmr. The acquisition proposals in respect of both the Shrines
have been finalized and valuation cases for acquisition of
structures at
Peer Dastgeer Sahib have already been framed and are being put
up in HLC Meetings. The Construction work at both the
places is being got executed through J. K. P. C. C. and
cost offer for Extension of the Shrine building at Peer
Dastigeer Sahib has been framed by JKPCC and submitted to (R
& B) Department at a cost of Rs.689.00 lacs for phase-I.
Funds as mentioned below have so far been released for
development of infrastructure at these two places:-
1. Peer Dastageer Sahib
= Rs.10.00 Crores
2. Ziyarat Naqashband
Sahib (R.A)
= Rs.10.00 Crores
|
|
Decision
10
|
Action
by
|
Action
taken report
|
|
HCM complemented Deputy Commissioner, and his staff
for initiating steps for measuring
Dal and Nigeen
lakes and
documentation of its
details since 1921 and asked him to complete
the same at the earliest.
|
DDC, Sgr
|
( Decision Implemented )
|
|
Decision
11
|
Action
by
|
Action
taken report
|
|
It was pointed out that certain Govt. buildings
have been constructed in the Srinagar Municipal limits without
obtaining building permission from the Municipal authorities.
It was decided that henceforth the Govt.
departments shall submit building plans and seek proper building
permission from the Municipal Authorities before taking up the
construction of any building.
In case any deviation is found by the Municipal
authorities, the matter should be dealt strictly under the
Municipal Laws.
|
Commr, SMC/SSP/ DDC Sgr.
|
The Commissioner, MC Sgr. Vide his letter NO: SMC/OSD/
Com/ 1642-43 Dated: 28-01-2009 has intimated that the list of
un-authorized constructions by various Govt. departments in
Srinagar
city is being compiled by the enforcement wing of SMC. Four
govt. departments have so far approached the Srinagar Municipal
Corporation for granting permission of various buildings,
Requisite permissions have been granted.
However, the instructions have been conveyed to all the
executing agencies to seek permission from Municipal
Authorities.
|
|
Decision
12
|
Action
by
|
Action
taken report
|
|
Deputy Commissioner shall provide the address of
the office (S) with the details of jurisdiction and the list of
officers heading these offices
and their phone
Nos. to Hon’ble MLAs within
a week’s time.
|
DDC, Sgr
|
The details of jurisdiction and the list of
officers heading these offices and their phone Nos. have been
communicated to Hon’ble MLAs.
(Decision implemented )
|
|
Decision
13
|
Action
by
|
Action
taken report
|
|
The Department of Consumer Affairs & Public
Distribution shall explore the possibility of opening of two
outlets at Naseembagh
and Mirakshah Colonies Hazratbal.
|
Dir. CA&PD Kmr.
|
The Dir. CA&PD Kmr. has intimated that the
outlets at Naseembagh, Nagin & Mirakshah colonies have been
opened by way of internal adjustments. The accommodation is
still under construction. However food-grains to these areas
have been dispatched and temporary storage arrangements have
been made till the construction is completed.
(
Decision Implemented )
|
|
Decision
14
|
Action
by
|
Action
taken report
|
|
The approaches to Tailbal bridge shall be completed
after resolving the issue with the land owner.
|
MD JKPCC/ Director (Transport) ERA/DDC, Sgr.
|
The SE, R &
B Circle
Srinagar
/ Budgam have intimated that approaches to the bridge have been
constructed by JKPCC and the bridge is through for Vehicular
Traffic.
(
Decision Implemented )
|
|
Decision
15
|
Action
by
|
Action
taken report
|
|
It was decided that in case of limited availability
of furniture and fixtures for Govt. Schools, limited No. of
schools be taken up and completed; rather than spreading the
resources thin.
|
Director Education (K)
CEO, Sgr.
|
The Chief Education Officer, vide his letter No:
CEO/PLg./& Sts./12/2009/5480-81 dated: 31-12-2009 has
intimated that during year 2009, 375 No. of Chairs and 255 No.
of Teapoys were purchased. These were issued to only those
schools having dire felt need. Coir Matting was distributed to
only those schools which were without this facility.
|
|
Decision
16
|
Action
by
|
Action
taken report
|
|
The state land measuring 15 Kanals available near
Patwar Khana / Orphanage at Harwan
shall be transferred
for construction of a modern ISM hospital.
A detailed Project Report shall also be
prepared in this respect about the suitability
of land for .
|
DDC, Sgr. / CE, R&B, Kmr/ Director, ISM Sgr.
|
Director, India System of Medicaians has intinmated
that 15 Kanals of land under survey No. 116 near Patwar Khana/
Orphanage at Harwan recorded as Sarkar has been identified for
construction of and establishment of Aromatic Plant garden. The
revenue papers have been authenticated by the ADMO Srinagar on
behalf of ISM Department with Revenue authorities on
11.11.2009,. The process of transfer of land to ISM Department
is under active consideration in Revenue Department as per the
latest communication received from Dy. Commissioner, vide his
No. 467/SQ/Misc dated 15.6.2010. As soon as the land is
transferred the DPR’s shall be prepared.
In the meanwhile, a high level meeting charied by
Chief Secretary on 11.6.2010 the issue was discussed with the
Secretary to Government of India, Department of AYUSH wherein
inter-alia it was decided that Central Counsil for Research of
Unani Medicine(CCRUM) will provide 14.00 crores for construction
of specialized (ISM) Hospital for Medical Tourism and National
Centre for preclinical safety evaluation of Unani Drugs which
reportedly stands approved by the Hon’ble Union Health and
Family Welfare Minister.
|
|
Decision
17
|
Action
by
|
Action
taken report
|
|
Maintenance of roads.
|
Commr/Secretary Planning
Deptt. / Commr./Secy
H&UDD/ Commr, MC Sgr.
|
The Housing & Urban Dev. Deptt. vide letter
Bo:-HUD/Plan/500/2003 dated:-01/07/2010 has intimated that in
view of the provision of the Municipal Corporation Act 2000,
where by Municipal Corporation is authorized to levy taxes,
license fee etc. to raise resources: the Corporation should
itself take a decision on such issues regarding the need for
extra manpower keeping in view the job requirement and
availability of resources.
Proposal regarding procurement of garbage handling
equipments required for improving the city sanitation has been
submitted to Planning & Development Department vide letter
No:-HUD/Plan/89/2009 dated:-30/10/2009 for release of Rs. 10.00
crore for the cities of Jammu and Srinagar, which includes
purchase of road sweeping machines and garbage compactors.
Response of Planning Department is still awaited.
|
|
Decision
18
|
Action
by
|
Action
taken report
|
|
Education department shall furnish the list of the
schools functioning in, School-Wise enrollment, teachers and
other staff posted in these schools, and school-wise sanctioned
staff strength.
Similarly, the Health Department shall also furnish
report with regard to different health institutions functioning
in the district, indicating therein the available
infrastructure, number of doctors, paramedical staff, together
with sanctioned strength with a view to rationalizing the
functioning of these institutions. Both the reports shall be
submitted to Hon’ble Chief Minister within 15 days.
|
Director School Edu. Kmr/
Director Health Services Kmr.
|
The Chief Education
Officer, Srinagar and
the Chief Medical Officer, Srinagar have furnished the requisite
information which has been forwarded to the Principal Secretary
to Hon’ble Chief
Minister vide this office letter No: DDC/DEV/5956-57
dated:14-01-2010.
(
Decision implemented )
|
|
Decision
19
|
Action
by
|
Action
taken report
|
|
The park located at Brain known as shall be
transferred back to Municipal Corporation Srinagar for
construction of a Community Hall, provided it is not falling in
the notified “Green Belt Area.”
|
Director, Gardens, Parks & Floriculture / Commr,
MC Sgr.
|
The Commissioner Srinagar Municipal Corporation
vide his letter No: SMC/OSD/Com/1518-22 Dated:09-01-2010 has
intimated that a team of Officers comprising of Vice Chairman,
Lakes and Waterways Development Authority, Chief Town Planner,
and the Rep. of District
Development Commissioner,
along with Town
Planning Wing and concerned Executive Engineer, Srinagar
Municipal Corporation visited the site along with
Concerned Hon’ble MLA.
The local residents of Brain, Nishat Srinagar gathered in
the said Park and vehemently disagreed for construction of
Community hall inside the park and considering the mood of the
people, the team of Officers along with MLA decided not to
undertake any construction in the said park for construction of
community facility. The Hon’ble MLA was requested on spot to
identify alternate side wherein proposed community hall will be
constructed.
|
|
Decision
20
|
Action
by
|
Action
taken report
|
|
It was pointed out that an amount of Rs.20.00 lacs
has been spent for providing and installation of lights at
Habbakaddal bridge. Similarly,
a huge amount has been spent on providing
of lights at Nawakadal and other
bridges. However,
at present no lights are functional at these locations.
The Hon’ble Chief Minister
desired to ascertain the agency responsible
for installation
and maintenance of these
lights and asked for a factual
report within two days.
|
DDC, / M.D JKPCC
|
The Superintending Engineer, EM & RE Circle –
Ist Srinagar has intimated that the lights
on Fatehkadal bridge,
Habbakadal bridge, Nawakadal
bridge and
Zainakadal bridges have been installed/ Commissioned.
|
|
Decision
21
|
Action
by
|
Action
taken report
|
|
The Education Deptt. Shall identify private school
buildings for acquisition in a phased manner in city so as to
give better environment /space to the students.
Besides, the Department should explore the possibility of
providing incentives
to the house owners for renovating the buildings
which are hired by the Education Department
for schools to
make these
structures safe and suitable
for the students.
|
DDC Sgr./
Director
School
Education Kmr. / Chief Education Officer, Sgr.
|
The Chief Education Officer, vide his letter No:
CEO/Plg./ & Sts./12/2009/5480-81 dated: 31-12-2009
has intimated that in the first instance, four schools
have been identified which are housed in rented buildings. These
are:-
- Malik Sahib.
- Zaindar Mohalla
- Kralyar.
However, the acquisition papers
pertaining to High School Malik Sahib are under process .
|
|
Decision
22
|
Action
by
|
Action
taken report
|
|
Hon’ble Chief Minister desired that suitable site
may be identified for construction of a modern Swimming Pool in
city. A
detailed project report be got prepared and submitted to
Planning & Development Deptt. for consideration.
|
DC Sgr/ Chief Engineer R&B Kmr.
|
The construction of swimming pool at Rajbagh has
been taken up in hand at an estimated cost of Rs.1737.71 lacs
during 2009-10 and an amount of Rs.68.00 lacs has been spent
upto ending March 2010.
(Decision
implemented )
|
|
Decision
23
|
Action
by
|
Action
taken report
|
|
Housing & Urban Development Department
shall take appropriate measures for delinking the areas
from Srinagar Municipal
Corporation, which have
absolute rural character
and were annexed with Municipal Corporation Srinagar in the
recent delimitation .
|
C/S H&UDD/
Dir.
RDD
|
The Housing & Urban Dev. Deptt. Vide letter
No:-HUD/Plan/ 500/2003 dated:-01/07/2010 has intimated that SMC
has been asked to identify areas which have absolute rural
character for de-linking purposes.
|
|
Decision
24
|
Action
by
|
Action
taken report
|
|
The Hon’ble MLA Sonwar raised
the issue of constt. Of PHC at Zewan.
It was decided that
the Health department
shall furnish report
regarding present status
of custodian land identified for construction
of the PHC Zewan to
Planning & Development Department.
Planning & Development
department shall
consider the case for const. of building and creation of staff
for PHC Zewan.
|
Director, Health Services
Kashmir
/ Commr/ Secy H&ME / C/S P&DD
|
The Director Health
Services Kashmir vide
his letter No: DHSK/Plg/DDB-Sgr/2009-10/1036-38
dated:18-06-2010 has intimated
that the Custodian
General Evacuee property was
requested to
intimate the cost of
compensation /premium for 6
kanals and 17 marlas
at Zewan identified for construction of PHC building. The
Custodian General intimated that an amount of Rs.20.55 lacs are
required as premium @ Rs.3.00 lacs per kanal for onward transfer
of the instant land to the Health Department.
Accordingly the said amount was released in favour
of Custodian General Evacuee property for the said land
through Chief Medical Officer.
Now the Custodian General is demanding Rs.54.80
lacs as premium for 6 kanals and 17 marlas @ Rs.8.00 lacs per
kanal. Thus there is a balance of Rs.34.25 lacs. The matter
regarding enhancement in the premium from Rs.3.00 lacs to
Rs.8.00 lacs per kanal stands brought into the notice of
Administrative Department vide letter No: DHSK/plg/570/747-51
dated:25-05-2010.
|
|
Decision
25
|
Action
by
|
Action
taken report
|
|
The land by one Dr. Naseema at Zakura / Habbak
shall be taken over by the Health and Medical Education
Department as per
the “deed” given by the brothers of the deceased doctor,
for construction of a health
care centre. It
was decided that the Health Centre be named after her
and the land shall
be used only for health care purposes.
The Health & Medical Education
Department should
proceed quickly to operationlize the proposed centre.
|
CMO Sgr./ Director Health
Services, Kmr. C/S H&ME
|
The Director, Health Services Kashmir has intimated
that the building has been got renovated through JK Police
Housing Corporation and taken over on 7th of January 2010. A
copy of Handover/take over report has been provided to the
brother of the donor of the property in presence of Director
Health Services Kashmir. The institution shall be named after
donor of the property when the same is made functional as a
health centre/ maternity centre.
|
|
Decision
26
|
Action
by
|
Action
taken report
|
|
Projections shall be made for development
of Garden known as
“ ” near Habbak Hazratbal
on the land measuring
33 kanals belonging to
Horticulture department
for converting it into Horticulture
Picnic spot.
|
Dir. Horticulture Kmr/ DDC Sgr.
|
The Director Horticulture Vide his letter NO:
Prod/12887-88 Dated: 15-12-2009 has intimated that the
department has already initiated steps for development of the
land as Horticulture Picnic Spot . Necessary lay out has been
prepared for its development and face lifting. Besides, the
following exotic plant material has been transplanted
|
S.No.
|
Kind
of Plants Planted
|
No’s
|
|
1.
|
Cherry
|
100
|
|
2.
|
Quince
|
50
|
|
3.
|
Pear
|
60
|
|
4.
|
Apricot
|
60
|
|
5.
|
Almond
|
50
|
|
|
TOTAL
|
320
|
Further the steps for its fencing have been already
taken up and the work is under execution. Due to the paucity of
the funds the fencing could not be completed within the due
course of time.
|
|
Decision
27
|
Action
by
|
Action
taken report
|
|
It was decided
that the SMC will identify a suitable piece of land
and prepare a DRP for construction.
|
SMC/ Commr. / Secy H&UDD
|
The
Housing & Urban Dev. Deptt. Vide letter
Bo:-HUD/Plan/500/2003 dated:-01/07/2010 has intimated that DPR
for construction of Corporate hall at Karan Nagar has been
framed at a cost of Rs. 358.00 lacs.
After the tendering process, the case was placed before
the State level Contract Committee for accord of approval to the
fixation of contract. The
SLCC has cleared the project in its meeting held on 20/05/2010.
Execution process shall commence soon and Rs. 1.00 crore
stands already released during 2009-10 in favour of SMC.
|
|
Decision
28
|
Action
by
|
Action
taken report
|
|
At least two more alternative sites for dumping
solid waste other
than Achan be identified.
|
SMC / Commr / Secy , H&UDD
|
The Housing & Urban Dev. Deptt. Vide letter
No:-HUD/Plan/500/2003 dated:-01/07/2010 has intimated that
approximately 409 kanal of land are available with SMC at Lasjan.
This site can be utilized as an alternate dumping site.
It is however proposed that the agency, which has
formulated DPR for Development of Achen for ERA, may be
requested to prepare Project Report for the same.
Further action is being taken.
|
|
Decision
29
|
Action
by
|
Action
taken report
|
|
The assistance of experts will be taken to prepare
projects in this regard so that financing support could be
explored.
|
Director, Archives/ Secy, Tourism
|
The Superintending Archaeologist vide his letter
No: 8/126/2001/M-7877 dated Ist January 2010 has intimated that
there are 69 monuments/sites declared protected for their
maintenance and upkeep by the Archaeological Survey of India in
J&K State. Neolithic site at Burzuhama and the monuments
namely Kathi Darwaza and Sangeen Darwaza are also included in
the list of the centrally protected monuments. Form time to time
necessary measures have been taken by the Circle to preserve
these monuments and the Conservation Works were taken in
accordance with the Conservation Programme approved by the
Director, General Archaeological Survey of within the
availability of the funds allotted for the purpose.
The Burzuhama site being Neolithic and in the past
Excavation has been carried out by the circle and Neolithic
tools and other material found during the Excavation.
There has been a proposal for construction of site
museum at Burzuhama but the same did not materliese so far due
to the difficulties faced for acquisition of land and now it has
been decided to construct a small museum at Lal Mandi Office,
Srinagar for the purpose of which land is available and
necessary plans/drawing being prepared for the purpose to
display the antiquities found at Burzuhama and other monuments.
The site was subject to vandalism by the vagaries of human and
nature, every effort was made to save the site.
Keeping in view of the importance of these monuments
necessary provision will be made in the Conservation Programe
being prepared for the year 2010-11 for conserving these
monuments on top priority for which it is necessary to take
steps to thwart any attempt by the anti social elements to
encroach upon the land adjacent to these monuments for which
necessary instructions needs to be issued by the State
Government to the concerned Police authority for keeping a vigil
on the anti social
elements so that no further encroachment takes place at these
monuments.
|
|
Decision
30
|
Action
by
|
Action
taken report
|
|
The project requires additional funding of Rs.8.00
crore. PWD will look into this for financial support under CRF
or any other Scheme.
|
Commr / Secy, PWD
|
The Superintending Engineer, R & B Circle
Srinagar/Budgam has intimated that Project Report for
2 Laning of
Buchpora Hazratbal Road under C.R.F has been framed at a
cost of Rs.2407.546 lacs and submitted to Commissioner/
Secretary (R&B) Kmr’s
No: 20833-35 dated:29-12-2009 as per following breakup:-
- Acquisition cost
= Rs.1972.33 lacs
2. Development cost
= Rs.435.23
lacs
= Rs.2407.56 lacs
|
|
|